Client: John Paul Construction

Architect: O’Mahony Pike

Engineer: Waterman Moylan Engineering Consultants

Arc Engineering worked closely with the design team & JPC to value engineer the balconies on this project – a process which delivered the client substantial savings.

The balconies were all pre-assembled in our factory in Wexford with a drainage layer, decking and balustrades already fitted. The balconies were then transported to site and lifted straight from the trailer and fitted to the building ready for use straight away, saving time and resources.

  • 160no. balconies
  • Mixture of cantilevered and supported
  • All galvanised and powder-coated
  • Fully drained
  • Composite decking
  • Powder-coated aluminium panel soffits
  • Opaque glazed privacy screens