MKN Property Group have worked with ARC Engineering on a no of projects recently where they were appointed to do all steel fabrication and fitting.
Most recently we worked together on apartments in Fosterstown Place in Swords in which part of their package consisted of the manufacture and fitting of pre-fabricated balconies.
It was the first time we used this system, and I found the process seamless from start to finish.
From supplying the template/shucks to schedule with floor screed program, then stubs fitted following Brickwork, everything was delivered and fitted as agreed on schedule which were accompanied by weekly inspections and constructive and helpful site team led by Dave Duffy.
Once scaffold was removed, the balconies were delivered and fitted in a very timely and efficient manner. I genuinely was very impressed with this system, and they fitted perfectly and the whole building was completed over 14 working days which included 54 separate balconies up to 7 storeys and the main thing is they look great.
It is our intention to use this system and ARC Engineering on any future projects with similar required and wouldn’t hesitate to recommend them to anyone considering using them or this system.