Jason has been working in construction since 2005. In 2008 he joined the draughting team at Nugent Manufacturing using Tekla Structures and has been designing ever since. Jason joined Arc Engineering in December 2022 and has worked in many areas in offsite manufactured balconies for large residential apartment buildings, pharmaceutical and data centres.
Jason has considerable steel experience in designing structural, secondary steel, walkways, stairs, platforms, stair cores and bespoke architectural metalworks. He is especially proud of two bespoke projects which included Diarmuid Gavin’s moving garden at the Chelsea Flower Show and a number of feature stairs in Microsoft’s new Head Office.
Jason has collaborated on many BIM projects using Tekla Structures and his knowledge of Revit, Autocad, Trimble Connect and Navisworks and has experience in the Trimble X7 3D scans as a means of surveying areas.